Energy

The first energy investment of our group was made in 1996 by Şık Makas Giyim Sanayi ve Ticaret A.Ş. Çorlu is the fuel station located right in front of the facility. Continuing investments in this area, a cogeneration facility investment was made in Çorlu garment and washing facility to generate our own energy. And finally, we continue to grow in the energy industry with the hydroelectric power plant in Ankara.

 

ŞIK MAKAS GİYİM SANAYİ VE TİCARET A.Ş. ÇORLU FACILITY COGENARATION INVESTMENT

The installed power of the investment made in 2006 is 1.56 MW. With this investment, we meet 80% of the energy of the Çorlu facility. We use the waste heat generated as a result of the energy generation process in the production of hot water and steam. Thus, we save 500,000 + m3 of natural gas per year, and thanks to this savings, we reduce our impact on the environment by preventing the release of approximately 1000 tons of carbon per year.

 

BENGİSU TEKSTİL SANAYİ VE TİCARET A.Ş. 

It is our fuel station established in 1996.

 

HİDAŞ ELEKTRİK ÜRETİM VE HİDROELEKTRİK SANTRALLERİ A.Ş 

Our facility is located in Ankara. It produces energy with an installed power of 7.33 MW and has an annual electricity generation capacity of 45 million kWh.

 

Şık Makas Giyim Sanayi ve Ticaret A.Ş. Çorlu Facility Cogenaration Investment

Şık Makas Giyim Sanayi ve Ticaret A.Ş. Çorlu Facility Cogenaration Investment

Velimeşe Organize Sanayi Bölgesi, Çorlu-Çerkezköy Yolu Cad. No:10 59930 Ergene-Tekirdağ, Türkiye

PHONE +90 282 676 44 22
FAX +90 282 676 44 27
Şık Makas uses cookies to improve the services provided and to ensure you have the best experience on the website.
close